N.U.B. Drilling tools used to improve road safety and stabilisation. Augers, drilling buckets and casings from N.U.B. are chosen for road project in England

The reliability and modern design of the foundation drilling equipment supplied by N.U.B. Engineering to contractors both in the UK and abroad has resulted in repeat custom from some of the most competent of drilling companies. The ability to supply tools to the most demanding specifications and within agreed timescales has resulted once again in N.U.B. supplying specific piling tools to complete a complex and demanding contract.

Foundation piles were chosen to restrain the embankment and stabalise the foundations of a bridge at a major motorway interchange where work commenced in September and was due for completion in only eight weeks. Asa tried and tested supplier N.U.B. were chosen to manifacture and delive rthe required tools on time to avoid any delay.

The robust design of the tools is specifically matched to the modern hydraulic rig specifications to maximise the efficiencies in drilling and fully utilise the rigs potential for speed and torque resulting in best use of equipment technology.

In working with the customer to produce the 2.43m diameter tools required for this work alternative teeth and digging edge configurations were considered for before the design for each of the digging tools was finalised.

“We are proud of the trust that is placed in the quality of our products around in the world“ Said the N.U.B. representative.

“With our know-how gained from more than 30 years of experience, we can systematically develop our drilling technology and provide outstanding, customer-oriented solutions. Commitment to quality and customer satisfaction from all of the team at N.U.B. have given us respect from our drilling partners around the world and we shall continue to strive to develop relations to further assist all our customers“.